Mitrou-Long leads Hapoel Holon to a comeback win over Würzburg

Photo: FIBA

By Eurohoops team / info@eurohoops.net

FIT/One Würzburg Baskets controlled the scoreboard for nearly 35 straight minutes on the road against Hapoel Netanel Holon but fell short of victory.

The Israeli side took the lead with two minutes remaining and ultimately secured a narrow 71-69 win. Both teams now stand at 3-2 in Group A, with Würzburg holding the head-to-head advantage.

Elijah Mitrou-Long led the way for Hapoel, erasing a 14-point deficit with 21 points and eight rebounds for a PIR of 18. Netanel Artzi contributed 14 points, and Dakarai Tucker added 12. Michael Kyser scored three of his five points in the crucial moments.

For the German team, Zac Seljaas recorded 17 points and six rebounds, while Jhivvan Jackson came close to a double-double with 17 points and nine assists. Tyrese Williams added 13 points, and Nelson Phillips chipped in 11.

Postgame press conference

Make Your Preferred Basketball Source.

Add Eurohoops to Google
Related Post